Resource Requirements
Technology Requirements
- fiber and ATM to the desktop and the manufacturing floor
- Parametric’s Pro-E
- GDC ATM and multimedia switches
Personnel Requirements
- design and manufacturing engineers
- ATM network engineers and technicians
External Requirements
- SPRINT & Global One public ATM network